Plumbed
in the fuel pump with some rubber washers as the standard rubber mounts
were too flexible. Started on the fuel and radiator plumbing. The -4
hose end need opening up for -5 hose and 5/15 (8mm) unions. I found the
easiest way to do this was with a deburring tool. Finalised throttle cable attachment,
adjustment and brackets, radiator top
brackets, throttle return spring bracket. Made a gearbox mounting
plate to stop the gearbox moving to much, welded a small plate on the
throttle for the throttle stop. Started making the air box.
Made a bracket for the oil
catch tank.
Updated the
web site at last.